PIPE BRIDGE. P1

Pipe bridge for green steel plant in Boden, Sweden. Prirority 1


Scope of work:

The CIVICON team is responsible for structural modeling, and workshop drawings of the pipe bridges - an essential structure connecting key parts of the new large-scale green steel plant.

  • Production / Fabrication Drawings
  • BIM


Structural models and documentation were developed using BIM-based workflows to ensure accurate coordination, analysis, and construction compliance.

A unique aspect of this project was working with parametric and isometric pipeline drawings to correctly place all supports. Since the pipelines were installed directly at the factory, our team had to ensure precise positioning and alignment. This required close coordination with other teams to make sure the supports fit perfectly.


Client:

FERRMIX CONSTRUCTION OÜ

VOLUME
2000 tons of steel structure
COMPLETED
2025
LOCATION
Boden, Sweden
CATEGORY
Industrial Buildings, International Projects