The scope of work included the design of platforms, as well as the production of detailed workshop drawings for fabrication and installation.Platforms for high concrete piers are developed for inspection, and maintenance activities.The solutions were engineered to meet structural safety requirements, constructability constraints, and site-specific conditions. Special attention was given to load assumptions, durability, and integration with the bridge substructure, ensuring reliable performance throughout the project lifecycle.
E12 – Bridge over Umeälv River is a major infrastructure project on the European route E12 in northern Sweden.The structure consists of a 530-metre long bridge spanning the Umeälv with multiple long spans designed to optimize traffic flow for both vehicles and pedestrians/cyclists.
Maru THM OÜ