Our company was responsible for the structural design of the first floor, executed in precast reinforced concrete. The concrete podium was designed to provide structural robustness, load transfer, and fire resistance for the building.
Close coordination with the construction team was maintained to ensure accurate installation and proper alignment of the upper floors. This cooperation was essential to guarantee that the prefabricated superstructure above could be assembled precisely and efficiently in accordance with the design intent.
Framm AS